EasyManua.ls Logo

OdorStop OS36 - Duct Installation Procedure

OdorStop OS36
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing Unit in Duct Work
CAUTION: BE SURE TO WEAR APPROPRIATE PROTECTION AS CUTTING METAL IS LOUD AND
PIECES MAY BE SHARP AND HOT (I.E. HAND, EAR, EYE, AND FACE PROTECTION)
1.DisconnectpowertotheHVACsystembeforeinstallingtheunit.
2. Cut out the template from the back page and tape it to the duct work in
intended installation position.
3. For OS36: drill pilot holes 1- 5 with a 3/32” drill bit where indicated.
For OS72: drill pilot holes 1- 6 with a 3/32” drill bit where indicated.
4. For OS36: cut one (1) - 2 1/2” hole in
duct as where indicated.
For OS72: cut two (2) - 2 1/2” holes
where indicated. Remove any burrs
andbesureductsurfaceisatafter
cutting hole(s).
3