EasyManua.ls Logo

OEC 9800C-Arm - Page 302

OEC 9800C-Arm
490 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Calibration
Filament/Duty Cycle Calibration
Note: For pre-OPIS system software, use the RUT utility CD.
Using RUT
1. Attach the Serial Com Port of the Laptop to the ARCNET Connection (J4) of the Workstation. On the Laptop, launch RUT.
2. In the upper left hand corner of the Main Menu Window click on Tools. Then highlight and click on Connect.
3. When the Login Succeeded Message comes up point and click on the OK Button.
4. In the left-hand column, click on Filament Calibration. When the Upload and Save Window appears, point and click on NO .
5. When the Filament Calibration Window appears, click on Take Duty Cycle Data.
6. When the Exposure Warning Window appears, click on OK.
7. When the new window appears, hold down X-Ray on switch on the Mainframe or hold down the Fluoro Switch on the Foot
Pedal (with a weight of some kind), then click OK . At that time you will notice that on the Control Panel of the Mainframe,
Running Calibration is being displayed.
Note: The Filament Calibration takes about 12 minutes to complete.
8. Verify that the Filament Calibration was completed without any failures. Release the X-Ray switch on the Mainframe or the
Foot Pedal to stop making x-rays.
9. Click on File located in the upper left-hand corner.
10. Highlight and click Save Duty Cycle Data File As.
11. When the new window appears, type in XXXXXXXX.dcd (Mainframe’s Barcode Number) then click on Save. Verify Duty
Cycle Data File was saved.
12. Click on Interpolate Data. Verify Interpolation is done.
13. Click on File located in the upper left-hand corner.
18
Service
Periodic Maintenance
Contents
Schematics
Illustrated Parts
Installation

Related product manuals