Replacement
7. Remove four screws that secure bottom half of Control Panel Bearing Block cover to bearing block..
8. Lower the bottom half of the Control Panel Bearing Block Cover.
9. Cut all wiring tie wraps, noting wire locations and routing. Tagging the wires and connectors will be helpful in reassembly.
10. Remove four hex keyed bolts that secure Bearing Block assembly to the Lift Column.
Bearing Block Assembly Mounting Bolt Removal
7. Lift up the Bearing Block slowly and carefully remove the cables.
8. Remove the Bearing Block.
100
Service
Periodic Maintenance
Contents
Schematics
Illustrated Parts
Installation