EasyManua.ls Logo

OEC 9800C-Arm - Page 9

OEC 9800C-Arm
490 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C-Arm Subsystem
Major Assembly and Control Locations
The following diagrams indicate the location of the major assemblies and controls of the standard C-Arm and the Super-C, or the
covers by which they are accessed.
Vertical Column
L-Rotation Assembly
Collimator Cover
X-Ray Tube Cover
Front Top Cover
Front Leg Cover
Right Front Cover
(Left Front Cover similar, not shown for clarity)
Cross Beam End Cap
Rear Cover Assembly
Control Panel Housing
Camera Cover
Image Intensifier
Standard C-Arm Subsystem Major Assembly and Control Locations
8
Service
Periodic Maintenance
Contents
Schematics
Illustrated Parts
Installation

Related product manuals