EasyManua.ls Logo

Olympus MU-1 - Page 14

Olympus MU-1
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Chapter 3 Preparation and Inspection
MAINTENANCE UNIT MU-1
Prepare the following equipment:
Leakage Testing
Remove water from the Air/Water Channel (For endoscope
with Air/Water channel only)
Personal Protective Equipment
Water Container
Maintenance Unit (MU-1)
Endoscope
Leakage Tester (MB-155 Optional)
Water-resistant Cap
(provided with the endoscope,
EVIS Videoscope only)
Personal Protective Equipment
Maintenance Unit (MU-1)
Endoscope
AW Channel Cleaning Adapter
(provided with the endoscope)
Alcohol Container
(only when irrigating with 70% ethyl
or isopropyl alcohol)
(MB-264 Optional)
70% ethyl or isopropyl alcohol
(only when irrigating with 70% ethyl
or isopropyl alcohol)

Other manuals for Olympus MU-1

Related product manuals