EasyManua.ls Logo

Omron NB-series - 4 Workflow; Workflow

Omron NB-series
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Workflow
- Workflow
The replacement procedure with NB-V1 is as follows. Operations in are explained from the next
page.
4-5-3 Checking the settings and communications
4-5-4 Starting operation
4-4-1 Installing the NB-V1 to the operation panel
4-2-3 Converting the project for NB-V1
4-4-2 Wiring the cables
4-5-2 Downloading the project to the NB-V1
4-3-4 Removing the currently installed NB from the operation panel
4-2-2 Uploading the project from the existing NB
4 -3 Removing the currently installed NB
4-3-1 Turning OFF the power to the currently installed NB
4-2 Preparation
4-5-1 Turning ON the power to the NB-V1
4-3-2 Removing all cables
4-4-3 Installing the storage devices
4-5 Start-up
4-4 Installing NB-V1
4-3-3 Removing the storage devices
4-2-1 Confirmation of replaceability

Other manuals for Omron NB-series

Related product manuals