EasyManua.ls Logo

ONFORU BDB55G-3 - Preparation and Safety; Assembly and Installation Guidelines; Required Tools for Installation; Electrical Safety and Warnings

ONFORU BDB55G-3
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREPARATION
7
Before beginning assembly of product,make sure all parts are present.Compare parts with
parts list.If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time:30-60 minutes.
Product appearance may vary from image shown.
Recommended to be installed on the ground above 2.5m (8.2 ft) and no higher
than 5 m (16.4 ft).
TOOLS REQUIREDnot included
Flathead
screwdriver
screwdriver Silicone Sealant Eye Protection Pliers Step Ladder
WARNING:
THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH
THE APPLICABLE INSTALLATION CODE BY A PERSON
FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF
THE PRODUCT AND THE HAZARDS INVOLVED.
NOTE:
CAUTION:
PLEASE MAKE SURE YOUR WALL SWITCH AND POWER AT
MAIN CIRCUIT BREAKER BOTH ARE OFF.
IF IN DOUBT ABOUT ELECTRICAL INSTALLATION, CONSULT
A LICENSED ELECTRICIAN.

Related product manuals