INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AS
PAGE 601
JUN 29/2022
© 2022 Orolia S.A.S. All rights are strictly reserved.
SERVICING
1. Maintenance Schedule
A. Periodic inspection
Note: (if required by the relevant Civil Aviation Authority).
Some Civil Aviation Authorities may require the ELT be tested periodically.
In this case, refer to Service Letter SL S18XX502-25-12 “Guidelines for
periodic inspection” available on the Support section of Orolia website.
B. Battery replacement
Testing of the various elements of the ELT is mandatory when the battery is
replaced:
• For battery replacement intervals, Refer to 2. Battery replacement
requirements, page 602.
• The testing procedure associated with the battery replacement is
described in the level 2 CMM 25-63-05.
For CMM download and other servicing instructions, refer to the Support
section of Orolia website: https://www.orolia.com/support/
.
Battery replacement:
carried out by a PART 145 or FAR 145 (or equivalent) maintenance
station as described in Service Letter SL S18XX50X-25-02 Maintenance
Policy for KANNAD ELTs.
Periodic inspection
:
depending if the ELT is opened or not, PART 145 or FAR 145 (or
equivalent) may be required. Refer to local regulations