EasyManua.ls Logo

Orolia KANNAD 406 AS - Page 44

Orolia KANNAD 406 AS
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AS
PAGE 602
JUN 29/2022
© 2022 Orolia S.A.S. All rights are strictly reserved.
2. Battery replacement requirements
Battery replacement is mandatory:
after more than 1 hour of real transmission (cumulated duration);
before or on the battery expiration date;
after use in an emergency;
after an inadvertant activation of unknown duration.
List of KANNAD Battery Replacement Center is available on our Website:
https://www.orolia.com/support/
Orolia S.A.S.
Z.I. des Cinq Chemins CS10028
56520 GUIDEL - FRANCE
Telephone: +33 (0)2 97 02 49 49
Web: https://www.orolia.com
Support: https://www.orolia.com/support/
Only original and approved battery pack included in battery KIT
BAT300 supplied by Orolia S.A.S. can be installed.
The battery replacement can only be carried out by a Kannad Approved
Service Center.
For more information, refer to Kannad ELT Maintenance Policy
available on Orolia website.
Orolia S.A.S. refuses all responsibility and invalidates all warranty
should unapproved maintenance be carried out.

Related product manuals