Information
Heat Pump Model (Outdoor) Serial Number
Heat Pump Model (Indoor) Serial Number
Cylinder Model DHW Tank Booster Heater Capacity (kW)
Coil Surface Area of Cylinder (m²) Serial Number
Boiler Model (Bi-valent system)
Installation Company Address
Installation Company Name
Post Code
Controls - System and Heat Pump
Automatic Bypass Fitted
Volumiser Fitted (2 pipe) Volume
Buffer Tank Fitted (4 pipe) Volume (L) 3rd Party Heating Controls (L)
Thermostatic Radiator Valves Outdoor Ambient Air Sensor (PAW-A2W-TSOD)
Buffer Tank Sensor Fitted (PAW-A2W-TSBU) Panasonic Optional Upgrade PCB Fitted (CZ-NS4P)
Panasonic Room Thermistor Fitted (PAW-AW-TSRT) 2 x 2 Port Valve (DHW Control)
3 Port Valve (DHW Control) Plastic Pipe Size (O/D) Used On Primary Circuit
Copper Pipe (O/D) Size Used on Primary Circuit
System Check
The System Has Been Flushed And Cleaned In Accordance With BS7593:2019 And Heat Pump Manufactures Water Quality Instructions Y/N:
The System Has Been Filled and Pressure Tested (Y/N): Inhibitor Used:
Glycol (Antifreeze) Used: % of Glycol in the System (%)
Outdoor Unit
Sited in correct, agreed location (covering planning & noise requirements)? Secured to a solid base?
Is the unit installed according to manufactures clearances? All external pipes insulated?
Has suitable consideration been made for condensate water? Isolators tted by unit?
Refrigeration Details (Not required for Monobloc)
Refrigeration Pipe Length Between
Indoor and Outdoor Unit
(m)
Additional Refrigerant Charge
Added (if required)
(g)
Name of Qualied Refrigeration
Engineer
Company Name
Bi-Valent (Hybrid) Connection
Mains Gas Boiler Oil Boiler LPG Boiler Electric Heater
Electrical Connection
Power Supply 1 Cable and Breaker Sized Correctly Power Supply 2 Cable and Breaker Sized Correctly
PANASONIC AQUAREA A2W
COMMISSIONING CHECKLIST
(H & J SERIES ONLY)
N.B. a commissioning sheet is mandatory in order to have a valid warranty coverage uk-a2w-tech@eu.panasonic.com
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment
as a means of demonstrating compliance with the appropriate Building Regulations and Manufactures Requirements.
Failure to install and commission this equipment according to the manufactures instructions will invalidate the warranty. This does not affect
your statutory rights.
Customers Name
Address
Postcode
PANASONIC AQUAREA A2W
COMMISSIONING CHECKLIST
(H & J SERIES ONLY)
*To confirm demonstration of equipment operation
System Set Up
Heating Settings Zone 1
Direct Outlet Temperature Used C)
Compensation Curve
Outlet Temperature at Outdoor Low C) (example 55°C) Low Outdoor Temperature C) (example -3°C)
Outlet Temperature at Outdoor High C) (example 35°C) High Outdoor Temperature (°C) (example +15°C)
Heating Settings Zone 2
Direct Temperature C)
Compensation Curve
Outlet Temperature at Outdoor Low C) (example 55°C) Low Outdoor Temperature C) (example -3°C)
Outlet Temperature at Outdoor High C) (example 35°C) High Outdoor Temperature (°C) (example +15°C)
Outdoor Temperature for Heating OFF C) (example 18°C) Outdoor Temp. for Backup Heater ON C) (example -3°C)
Heating Settings Zone 2 (Pool)
Secondary Side Flow Temperature Set-point C) Pool DeltaT
C)
System Set Up
Heating Mode
Outside Ambient Temperature C)
Water Outlet Temperature C) Flow Rate (L/Min)
Water Inlet Temperature C)
Compressor Frequency (Hz)
DHW Mode
Outside Ambient Temperature C)
Tank Target Temperature C) Flow Rate (L/Min)
Water Outlet Temperature C
Water Inlet Temperature C) Compressor Frequency (Hz)
DHW Settings
Target DHW Tank Set Temperature C) Tank Heat Up Time (max) (Recommended max 60 mins)
Tank: Re-heat Temp C) (between -2 / -12°C) Floor Operation Time (max) (Recommended max 2 hours)
Tank Heater: Internal (Backup) or External (Booster): Tank Heater on Time (delay)
Bi-Valent (Hybrid)
Control
(Alternative)
Control
(Parallel)
Control
(Advanced Parallel)
Outdoor Temperature for
Bi-Valent on
C)
Smart Grid Bi-Valent
(J Series Only)
Auto Bi-Valent
(J Series Only)
Backup Heater Setting
Room Heater Enabled Y N
Backup Heater Capacity Setting
(3,6 or 9kW depending on the model)
(kW)
Sterilization Settings
Sterilization Day Sterilization Time (h:m) Sterilization Temp C) Sterilization Duration (Minutes)
Commissioning Engineer’s Name
Commissioning Engineers Signature
Customer’s Name
Date of Commissioning
*Customers Signature
N.B. a commissioning sheet is mandatory in order to have a valid warranty coverage uk-a2w-tech@eu.panasonic.com