EasyManua.ls Logo

Panasonic CU-E18GFE-1

Panasonic CU-E18GFE-1
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
9.15.3.4. Deice Control
A. Deice operation (Normal Deice Operation)
1. Detection methods
Outdoor heat exchanger temperature sensor, timer.
2. Deice operation time chart
Notes
• During deice operation, as relationship for outdoor piping temperature and time T5, the priority given to the condition which
is first fulfilled and shift to the next mode.
• First deice after operation restricted to 60 min. & above.
• No restart operation if compressor OFF for sequence No. 8, 9.
(Instantaneous, restart)
3. Deice operation judgement condition
When any of below a, b, c, d condition is satisfied, deice signal is produced.
a. Continuously, outdoor heat exchanger temperature < 3
q
C for 120 minutes and outdoor heat exchanger temperature
< -6qC for 3 minutes and outdoor air temperature > -1qC and Comp. is ON.
b. Continuously, outdoor heat exchanger temperature < 3
q
C for 80 minutes and outdoor heat exchanger temperature < -7
q
C
for 3 minutes and outdoor air temperature > -1
q
C and Comp. is ON.
c. Continuously, outdoor heat exchanger temperature < 3
q
C for 40 minutes and outdoor heat exchanger temperature < -9
q
C
for 3 minutes and outdoor air temperature -3
q
C and Comp. is ON.
d. Continuously, outdoor heat exchanger temperature < 3
q
C for 40 minutes and outdoor heat exchanger temperature
< -11
q
C for 3 minutes and outdoor air temperature < -3
q
C and Comp. is ON.
However, the first deice will start only after minimum of 60 minutes in operation.
(2nd deice and onward shall follow above conditions)

Table of Contents

Other manuals for Panasonic CU-E18GFE-1

Related product manuals