6.2.2.2. Installation of the 2nd Lens Frame Unit
Screw(I) ×3
2-5 Cam Pin for 2nd Lens Frame Unit ×3
1. Install 2nd Lens Frame Unit to Cam Barrel Unit
with adjusting the rotational phase as the 2-5 Cam Pin penetrates.
2. Install 2-5 Cam Pin for 2nd Lens Frame Unit and tighten screw (H)
by using the torque driver with specified torque.
- Screw(I) × 3
- Torque : 12±0.5Ncm
3. Glue the 2-5 Cam Pin for 3rd Lens Frame2 Unit
with “Three Bond 1401B or 1401C”
* The glue does not come out above the 2-5 Cam Pin
7mm
Cross section
Gluing area
2nd Lens
Frame unit
2-5 Cam Pin
When reusing it, tighten with a torque of 6~8Ncm.
(3 screws should be tightened with same torque)
Align the △ markings with each other.
4
4