6.2.2.4. Installation of the Ring Mount Base Unit
OIS FPC
OIS FPC
Aperture FPC
Insertion Hole
Insertion Hole
Screw (F)
Zoom Drive Pin
3. Attach Zoom Drive Pin and tighten screw (F)
by using the torque driver with specified torque.
- Screw(F) × 1
- Torque : 14±1Ncm
Aperture FPC
1. Install 1st Lens Frame Unit with Cam Barrel Unit to
Ring Mount Base Unit with adjusting the rotational phase
as shown in the figure while pulling out the FPC
via the Hole.
<Note>
- When installing, insert these FPC into the insertion hole
- Do not damage the FPC
SILVER
2. Tighten screw (G)
by using the torque driver with specified torque.
- Screw(G) × 4
- Torque : 20±2Ncm
screw (G)
OIS FPC
Aperture FPC
(Cross section)
Long Groove is upper side.
BLUE=Zoom Drive Pin
Orange=Screw (F)
Cam Barrel Unit
Long Groove
Short Groove
7mm
4
Fix 2 FPCs.