EasyManua.ls Logo

Panasonic NN-E235MB EPG - Component Electrical Testing - Part 4

Panasonic NN-E235MB EPG
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-11
COMPONENTS TEST PROCEDURE RESULTS
TIMER MOTOR
(Wire leads removed)
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Normal:
Abnormal: Infinite or several
ohm.
Normal: Approx. 100~200 kohm
Abnormal: Infinite or several
ohm.
Note:A is ON,OFF switch B is
power supply terminal of the
timer motor C is defrost switch
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
A ~ B A ~ C
30 ~ 50 300 ~ 500
Turn on
A
B Approx. 25 K
Turn Off
C
(2-3)
B
(2-M)
A
(1-2)
A
B
C

Related product manuals