EasyManua.ls Logo

Panasonic PV-M1327

Panasonic PV-M1327
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-9
Alignment
Projection
Mode Select SW. on Main C.B.A.
SERVICE
Rotate
Extension
Cable -1
Mode Select SW. Ass'y
Extension Cable -2
Full Erase Head
Connector
Mode Select
SW. Connector
(Foil Side)
P3501
P6201
P6002
Keep away these cables from
TV Main C.B.A. as possible.
Safety Tab SW.
P4001
Main C.B.A.
P3003
Frame
tape
tape
tape
masking tape
TV
TV Main C.B.A.
Mechanism
Chassis and
Cassette Up Ass'y
It is not necessary to connect
Degaussing Coil Connector
CAUTION:
HOT CIRCUIT
DO NOT
touch Power
curcuit during service.
2. Service Position with Extension Cable Kit
In Service Position with Extension Cable Kit, mechanism check from the Bottom Side of Mechanism Chassis and Capstan Stator
Unit (Capstan Motor Drive, Loading Motor Drive Circuit) check with power on condition can be performed.
Fig. 3-1
CAUTION:
HOT CIRCUIT
(Primary circuit) exists on the Main C.B.A. and TV Main C.B.A.
Use extreme care to prevent accidental shock when servicing.
Note:
When disassembling/assembling, refer to "Disassembly/Assembly Procedures of Cabinet" section.
Service Position

Related product manuals