EasyManua.ls Logo

Panasonic S-106MK2E5A - Straight Equivalent Length of Joints; Additional Refrigerant Charge

Panasonic S-106MK2E5A
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
■ Table 6 Indoor Unit Tubing Connection Size
Indoor unit type 22 28 36 45 56 60 73 90 106 112 140 160 180
*1
224
*1
280
*1
Distribution joint –
solenoid valve kit tubing
Suction tube ø15.88
ø19.05 ø22.22
Discharge tube ø12.70
ø15.88 ø19.05
Liquid tube ø9.52
Solenoid valve kit –
Indoor unit tubing
connection
Gas tube ø12.70 ø15.88
ø19.05 ø22.22
Liquid tube ø6.35 ø9.52
*1: For the solenoid valve kits, use CZ-P160HR3 with parallel specications. Branch the tubing before and after the solenoid valve kits.
1-7. Straight Equivalent Length of Joints
Design the tubing system by referring to the following table for the straight equivalent length of joints.
Table 7 Straight Equivalent Length of Joints
Gas tubing size (mm) 12.7 15.88 19.05 22.22 25.4 28.58 31.75 38.1 41.28
90° elbow 0.30 0.35 0.42 0.48 0.52 0.57 0.70 0.79 0.85
45° elbow 0.23 0.26 0.32 0.36 0.39 0.43 0.53 0.59 0.64
U-shape tube bent (R60-100 mm) 0.90 1.05 1.26 1.44 1.56 1.71 2.10 2.37 2.55
Trap bend 2.30 2.80 3.20 3.80 4.30 4.70 5.00 5.80 6.80
Y-branch distribution joint Equivalent length conversion not needed.
Ball valve for service Equivalent length conversion not needed.
Table 8 Refrigerant Tubing
Tubing size (mm)
Material Temper - O Material Temper - 1/2 H • H
ø6.35 t0.8 ø22.22 t1.0
ø9.52 t0.8 ø25.4 t1.0
ø12.7 t0.8 ø28.58 t1.0
ø15.88 t1.0 ø31.75 t1.1
ø19.05 t1.2 ø38.1 over t1.35
ø41.28 over t1.45
1-8. Additional Refrigerant Charge
Additional refrigerant charge amount is calculated below.
Required amount of additional refrigerant charge
= [ (Amount of additional refrigerant charge per meter of each size of liquid tube × its tube length) + (...) + (...)]
+ [(Necessary amount of additional refrigerant charge per outdoor unit) + (...) + (...)]
+ [(Necessary amount of additional refrigerant charge per meter of each size of discharge tube × its tube length) + (...) + (...)]
*Always charge accurately using a scale for weighing.
* If the existing tubing is used and the amount of on-site refrigerant charge exceeds the value listed below, change the size of the tubing
to reduce the amount of refrigerant.
Total amount of refrigerant for the system with 1 outdoor unit: 50 kg
Total amount of refrigerant for the system with 2 outdoor units: 80 kg
Total amount of refrigerant for the system with 3 outdoor units: 105 kg
Table 9 Necessary Amount of Additional Refrigerant Charge Per Meter, According to Liquid Tubing Size
Liquid tubing size (mm) 6.35 9.52 12.7 15.88 19.05 22.22
Amount of additional
refrigerant charge/m (g/m)
26 56 128 185 259 366
Table 10 Necessary Amount of Additional Refrigerant Charge Per Outdoor Unit
U-8MF3R7 U-10MF3R7 U-12MF3R7 U-14MF3R7 U-16MF3R7
1.0 kg 1.0 kg 3.9 kg 3.9 kg 3.9 kg
Table 11 Refrigerant Charge Amount at Shipment (for Outdoor Unit)
U-8MF3R7 U-10MF3R7 U-12MF3R7 U-14MF3R7 U-16MF3R7
9.8 kg 9.8 kg 11.8 kg 11.8 kg 11.8 kg
* When bending the tubes, use a bending
radius that is at least 4 times the outer
diameter of the tubes.
In addition, take sufficient care to avoid
crushing or damaging the tubes when
bending them.
Unit: mm
00_341136_2WAY_Eng.indb 12 2022/9/19 9:27:13