Design of 3WAY VRF SYSTEM
2 - 33
1
2
3
4
5
6
7
8
9
Reference diagram for snow-proof ducting (field supply) (continued)
Combination of units
For various types of combination.
unit: in. (mm)
D
E
8-17/64 (210) 8-17/64 (210)
7-3/32 (180) 7-3/32 (180)
E
DD
E
39-3/8
(1000)
G
2-29/32
(74)
34-21/64
(872)
2-29/32 (74)
34-21/64
(872)
H
7-61/64 (202)
20-9/32
(515)
20-9/32
(515)
18-13/16
(478)
18-13/16
(478)
18-13/16
(478)
19-1/4
(489)
19-1/4
(489)
19-19/64
(490)
7-61/64 (202)
57-23/32
(1466)
57-23/32
(1466)
25-25/32
(655)
57-9/16
(1462)
35/64
(14)
35/64 (14)
F
I
57-9/16
(1462)
25-25/32
(655)
28-55/64
(733)
101-3/16
(2570)
25-53/64
(656)
57-9/16
(1462)
39-31/64
(1003)
3/64 (1) 5/64 (2)
Top view
(Before installing snow-proof ducting)
Top view
C : 28-47/64 (730) Installation hole pitch
B : 28-47/64 (730) Installation hole pitch downward tubing direction
A : 37-61/64 (964) Installation hole pitch forward tubing direction
Front view Right side view
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from “A”, “B” or “C”.
DEFGHI
A : Installation hole pitch
45-9/32
(1,150)
46-29/64
(1,180)
153-25/32
(3,906)
153-35/64
(3,900)
149-21/64
(3,793)
192-3/64
(4,878)
B : Installation hole pitch
C : Installation hole pitch
01_280157_Eng.indd 23 2015-11-11 9:12:49
4. SELECTING THE INSTALLATION SITE
TD831183-00_北米向け3WAY.indb 33 15/12/17 16:05:17