EasyManua.ls Logo

Panasonic TK-AS700 - Steps to Take before Operation; Installation

Panasonic TK-AS700
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN12
Steps to take before operation
Installation 1
Check the main
unit and supplied
accessories
P. EN13
Installation 2
Checking
the faucet
P. EN14
Installation 3
Attaching the
bypass selector
The attaching method
diff ers depending on
the shape of faucet.
P. EN15
~
P. EN17
Installation 4
Installing the
Alkaline Ionizer
P. EN18
~
P. EN19
Space where the legs of
the main unit can be placed
18 cm or more
10 cm or more
Installation 5
Checks after
installation
The air in the main unit is
not completely exhausted,
please drain the water for
about 3 to 4 minutes.
P. EN20
~
P. EN21
Installation 6
Measure and
adjust the pH level
of water
P. EN22
~
P. EN23
TK-AS700_En.indb 12TK-AS700_En.indb 12 2022/04/14 18:17:402022/04/14 18:17:40

Related product manuals