EN | User Manual Maintenance and repair of the dryer
34 K-MT 10-95/D3
Regular maintenance intervals
Note:
If a chamber has been depressurised, e.g. after completion of the ex-pansion
phase, and the pressure remains above 0 bar, the chamber is pressurised by
what is known as ram pressure. This might be due to
◊ blockage at the muffl er(s)
◊ contamination of the perforated plates
◊ spent drying agent
To prevent such malfunctions, regularly service the dryer as described below.
The table provides an overview of the maintenance work to be carried out. The individual
tasks are described in the following pages.
Component Maintenance task to be carried out Maintenance
interval
daily
12 months
24 months
48 months
See page
Complete dryer Carry out visual checks and function checks.
•
36
Vessel pressure gauge Check dam pressure. For a dam pressure
exceeding 0.3 bar:
– Check muf er.
– Check dust sieve.
– Check drying agent.
•
36
Muf er Replace muf er after 1 year of operation and
after renewing the dessicant.
••
36
Fine lter muf er
(option)
Replace element of ne lter muf er after 1
year of operation and after renewing the drying
agents.
•
37
Dew point sensor
(with optional dew
point sensing-control)
Renew.
•
37
Pilot valves Renew
•
39
Main valves V1/V2 Renew
•
39
Expansion valves
V3/V4
Renew
•
39
Check valves V5/V6 Renew
•
39
Solenoids Renew
•
39
Drying agent Renew
•
39
Upstream and down-
stream lter
Please see the enclosed operating instructions for the attached lters.
Maintenance work has to be carried out as speci ed in this document.