EasyManua.ls Logo

PDR X410 - Installation

Default Icon
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.pdr-rework.com
Installation
This section is not intended to be a step by step guide to installing the PDR, the systems are complicated instruments
and need to be installed by PDR approved technicians, however, this section includes key points to consider before
commencing installation.
The PDR IR BGA Rework Systems were introduced early 2000s and have been developed to be able to be upgraded
from a basic system without BGA alignment to the full system as seen below.
Typical Configuration includes:
Focused IR Component Heating
750-3000W Quartz IR PCB Preheater
Precision XY PCB Table
Precision Pick-up System, with Macro-Micro Z-movement and Rotation
CCTV/Prism BGA Alignment
Advanced Software Control with PDR T5 Controller and PDR ThermoActive V4/V5 Software Suite.
CCTV/Prism BGA Alignment
Pick-up System
Focused IR Component Heating
System