Installation (continued)
Key Points to consider before the Installation
Professional Installation - The PDR System is a sophisticated instrument and should always be installed by
personnel trained by PDR, or by a PDR Distributor. All PDR systems are robust and forgiving but installing
them incorrectly will result in a loss of performance and dissatisfaction with the products.
Bench Size - The equipment must be sited on a firm surface at least 1.5m x 0.75m and at a height to suit the
operator. The location should be chosen to suit the flow of work.
Draught Free - The immediate areas must be free from draughts (air-conditioning draughts are often a
problem) that may reduce the heating efficiency.
Lighting - The lighting should not be so bright as to prevent the operator from viewing the IR spot or the
digital controller's L.E.D. displays.
Fume Extraction – depending on the process, it may be necessary to install an integrated fume extraction
system to comply with operator safety
Electricity - The electrical supply should be of the specified voltage, sufficient current capacity for the
stated power, free from R.F. interference, other noise, glitches etc. and be fully earthed/grounded compliant.
General Arrangement - The general bench top arrangement of the system should be as in the image above
Main System – place in centre of bench
Controller - Place the T5 controller go to the back-right of the system
PC Monitor - Place the PC monitor on the right of the main system
CCTV Monitor - Place the CCTV monitor on the left of the system.
Prism Control - Place the Prism LED controller on the left of the system