EasyManua.ls Logo

PEERLESS 2324 - Page 26

Default Icon
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION INSTRUCTIONS, cont.
Minimum clearance form combustible and noncombustible construction
6” from sides
6” from rear
No additional clearance from the sides and back is required for service,
as the units are serviceable from the front.

than 3/4” for your gas line. Check with your local utility company if
questions arise. It is recommended you install a gas pressure regulator to
assure constant pressure.
5. Check all connections for leaks using soapy water only.


for unit to operate.
7. Necessary adjustments have been made at the factory; however,
units should be checked at the place of installation to allow for local
conditions.
8. Turn burner valve “ON” and set thermostat to desired temperature.
Make sure burner ignites before leaving the room.

10. During normal operation: If pilot goes out, wait 5 minutes before
attempting to relight oven. This allows any accumulated gas to dissipate.
11. To shut oven down: Turn thermostat and oven burner to the “OFF”
position. Disconnect gas supply after pilot has gone out. Repeat steps 6
through 10 to relight.
NOTE: All adjusting and service should be performed by a person
knowledgeable in making such adjustments. If in doubt, call Peerless, a

22

Related product manuals