EasyManua.ls Logo

Pentair MAGICFALLS - Finishing Waterfall Installation

Pentair MAGICFALLS
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MagicFalls with LightCascade Technology LED Light Installation and User’s Guide
14
3. Finishing the Waterfall.
INSTALLING THE MAGICFALLS
®
WITH LIGHTCASCADE
TECHNOLOGY™ (CONTINUED)
After the mortar bed is cured,
remove the board. Be sure the
lip protector is in place before
installing the coping. Keep in
mind that you may need to add
¼” of filler on top of the lip to
level out the waterfall.