© 2015 Pentair Equipment Protection
89116616
- 32 -
S10 INSTALLATION INSTRUCTION
1. See Receiving The Air Conditioner and Handling and Testing The Air Conditioner on page 6.
2. Using the cutout template provided with the unit, prepare the enclosure. See Figure 13. The front of
the unit requires a half meter clearance for proper airflow. Five centimeters is required on each side
of the unit. To avoid condensate overflow, unit must be mounted within 3° of level.
3. Refer to mounting instructions on page 8.
4. Adjust controller to desired cabinet temperature. Refer to Displaying and Changing Program
Variables on page 13 for controller adjustment and operation.
356
14.00
310
12.19
378
14.88
920
(2)
36.22
913
35.94
370
(2)
14.56
254
10.00
292
11.50
273
10.75
359
14.14
250
(4)
9.84
280
(2)
11.02
255
(2)
10.04
385
(2)
15.16
951
37.44
400
15.75
400
15.75
951
37.44
10
(8)
.375
10
(4)
.375
4
.14
[.47]
12 X 45
(4 PLACES)
Surface Mount Partial and Full Recess Mount
Figure 13
S10 1000/1500W Cutout Drawing
Dashed Lines Represent The Air Conditioner