Do you have a question about the Perfect Aire 2PAMSH18B-17.7 and is the answer not in the manual?
Securely attach the mounting plate to the wall, ensuring it is flat and properly aligned with studs or using anchors.
Drill a 65mm diameter hole at a downward angle for piping, ensuring proper drainage and protection.
Prepare refrigerant piping by cutting insulation, removing knock-out panels, and bending piping carefully to avoid damage.
Attach the drain hose, ensuring proper drainage without kinks or water traps, and plug unused drain holes.
Prepare and connect the signal cable to the indoor unit's terminal block, ensuring secure connections and proper wire management.
Choose a suitable location for the outdoor unit, considering spatial requirements, air circulation, stability, noise, and protection from elements.
| Brand | Perfect Aire |
|---|---|
| Model | 2PAMSH18B-17.7 |
| Category | Air Conditioner |
| Language | English |












Loading...