EasyManua.ls Logo

Pfannenberg EB 30 WT - Page 22

Pfannenberg EB 30 WT
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
22
APPENDIX B1
Maintanace / Check and Inspections
CAUTION: Before any maintenance intervention, not needing the machine running, disconnect the supply
voltage and put the signal MAINTENANCE IN PROGRESS next to the Main switch
Carrying out the tests and check program listed below will extend the life of the equipment and avoid possible breakdowns.
Please Note: it is of utmost importance the compliance with Regulation (EC) No 842/2006, regarding mandatory regular
leakage-check program, as described in Section 2 of this Operation and Maintenance Manual.
Check mechanical working of the compressor . Control the absence of metallic vibrations and not too high noises and
temperatures on the compressor head during running to verify its regular working.
Check the operation of the fan.
Check the electrical alarm systems and controls.
Check the filling of the tank (visual level). If the system is filled with a glycol-mix, refill only with the same mix. Only water will
reduce the concentration of glycol.
Check that pressure, flow rate and temperature values of the hydraulic circuit are included into the limits indicated on the
machine label. For closed loop system (PWW) pelase verify periodically the pressure indicated on the manometer (with
pump OFF) to verify the precharge value. If it’s necessary a refill please follow the start up procedure in Appendix A2.
Picture 22 Compressor placement
Picture 23 Fan placement

Table of Contents

Other manuals for Pfannenberg EB 30 WT

Related product manuals