03
rd
April 2007 –
• Recheck that your EPROM receiver frequency is correct, NOT off frequency as
some people had last Tuesday nite. If they were off-frequency [Ken (VK2KJ)
will recheck your FM92E transceiver again], we will change your EPROM. Those
that were given the short FM92E, we will change them back to the long FM92E
that was converted from the batch of FM91E’s.
Ken, VK2KJ will recheck that your FM92E is on the frequency, again; then
10
th
April 2007 – Easter Break. The Rev Bruce, VK2ZAD has to recover from chocolate
over eating.
17
th
April 2007 –
• Members to bring along:-
1. Soldering Iron. [only if you have one]
2. De-Soldering Iron. [only if you have one]
3. 0.63mm [B&S 22] Enamelled Copper Winding Wire. [Leon has some spare
wire!!!!]
4. Paper if they want a printout of tonight’s operation. [approximately 10
pages]
• Remove cover on Receiver board side from the Philips FM92E Transceiver, this
is the side opposite from the two sockets at the rear of the FM92E
transceiver. Then mark the cover with your call-sign, then place it & the
cover’s screws into their GLAD bags & mark your Glad bags with your call
sign. Should be a minimum of 4 screws.
• From http://vk2afy.dyndns.org/6mconv/6mfiles.htm site, download the document
pages from sections 19 & 20 of file 6m_con.pdf, or from the directory
“D:FM92E Conversion to 6 meters” of the main computer in the operations room.
• Do VCO Change – See section 19 & 20, starting on page 20 of this document.
24
th
April 2007 – Continue with week 17
th
April 2007.
01
th
May 2007 – Video Movie on climate change. To give Leigh a rest for his eyes.
08
th
May 2007 – Start Receiver/Mixer Module change.
• Members to bring along:-
1. 4 of capacitors.
2. 0.80mm [B&S 20] Enamelled Copper Winding Wire. [Leon has some wire!!!!]
• From http://vk2afy.dyndns.org/6mconv/6mfiles.htm site, download the document
pages from sections 21 & 22 of file 6m_con.pdf, or from the directory
“D:FM92E Conversion to 6 meters” of the main computer in the operations room.
• Do Rx RF Amp/Mixer Change – See section 21 & 22, starting on page 29 of
document 6m_con.pdf.
15
th
May 2007 – Continue with week 08
th
May 2007.
22
th
May 2007 – Continue with week 08
th
May 2007.
29
th
May 2007 – Continue with week 08
th
May 2007.
05
th
June 2007 - Video Movie.
12
th
June 2007 - Start Tx PA Change.
19
th
June 2007 - Continue with week 12
th
June 2007.
26
th
June 2007 - Continue with week 12
th
June 2007.
03
rd
July 2007 - Continue with week 12
th
June 2007.
10
th
July 2007 - Continue with week 12
th
June 2007.
17
th
July 2007 - Continue with week 12
th
June 2007.
Philips FM92E Conversion to 6 Meters: Version 3.9 Page 81
24
th
July 2007 - Continue with week 12
th
June 2007.