EasyManuals Logo

Polygroup Funsicle Oasis Pool Quick Start Guide

Polygroup Funsicle Oasis Pool
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Locate a clean and flat level area free of stones
or sharp objects.
TIP: Let the liner sit under the sun for at least
two hours before assembling the rest of the
pool; this allows the liner material to be more
flexible, making it easier for you to attach it to
the beam frame structure.
STEP TWO: Assemble the pool frame and connect it to the liner.
STEP ONE: Prepare the site.
This Quick Start Guide provides a simple overview to your pool’s setup process.
For detailed setup guidelines, important safety information and useful tips, refer to the
enclosed “Funsicle Oasis Pool User Guide.”
Ready. Set. Play.
1. Lay all parts (located in Boxes 2a & 2b) on the ground around the pool liner as shown below:
2. Take one horizontal beam and insert it to one T-Fitting to form a set.
3. Carefully slide the horizontal beam set into the sleeves of the pool liner.
4. Connect the other sets of the horizontal beam with the T-Fitting (each should snap into place).
NOTE:
The Easy Link T-Fitting (located in Box 2b, in a plastic bag with “Easy Link T-Fitting” marking)
should be the FINAL T-Fitting to complete the top frame.
Oasis Pool
Quick Start Guide
Sign up for future
offers and discounts.
Scan the QR Code.
2a
2b

Other manuals for Polygroup Funsicle Oasis Pool

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polygroup Funsicle Oasis Pool and is the answer not in the manual?

Polygroup Funsicle Oasis Pool Specifications

General IconGeneral
BrandPolygroup
ModelFunsicle Oasis Pool
CategorySwimming Pool
LanguageEnglish

Related product manuals