Claws connect guardrail brace panels to frames, ensuring secure attachment for safety.
Frame clips lock tower sections together with a pin and red tab for secure assembly.
Coupler clamps secure stabilisers to vertical tubing, ensuring tower stability.
Wind-lock catches prevent platform uplift in windy conditions via auto-engaging hooks.
Component hangers facilitate single-person erection by carrying parts on the platform.
Keep components clean and free from contaminants; re-inspect after cleaning.
Lubricate moving parts lightly; store components dry, upright, and protected.
Quarantine damaged components; repair only by qualified personnel.
Dismantle by reversing erection; ensure balance and use guardrails during dismantling.
Display critical tower information like load class and assembly date for user safety.
Tower designed for safe storage of all components within the base assembly.
Optional castors create a trolley for the stair pack, but not for assembly.
Clear the floor area, check all components for condition and function before assembly.
3T method reduces erector fall risk during construction by using guardrail panels.
Consider tying in the tower for added stability, performed by trained personnel.
Use solid ballast as specified to stabilise against overturning, positioned correctly.
Instructions must be available to the user at the location of use.
Regularly inspect for damage; quarantine and repair only by qualified repairers.
Reverse erection procedure; ensure balance and use guardrails during dismantling.
Display critical tower information like load class and assembly date for user safety.
MI TOWER requires one person to assemble; frames can be connected for quicker assembly.
Position stabilisers at 45 degrees for maximum effect, ensuring all feet contact ground.
Insert adjustable legs into frames and adjust collars to the lowest position.
Construct lowermost frame with walk-through gate and four rung frame, securing clips.
Assemble uppermost frame with two rung and two four rung frames, securing clips.
Place walk-through frame assembly lowermost, attach guardrail brace panel securely.
Attach uppermost frame assembly and guardrail brace panel to vertical tubes.
Insert adjustable legs into walk-through frames, lowering all legs.
Assemble lowermost frame with two rung and four rung frames, securing clips.
Assemble uppermost frame with walk-through gate and four rung frame, securing clips.
Place lowermost frame assembly, attach guardrail brace panel to gate locking pin side.
Attach uppermost frame assembly and guardrail brace panel to vertical tubes.