EasyManua.ls Logo

Porkka F 840 - User Manual

Porkka F 840
132 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
ELEMENTTIRAKENTEISET KYLMÄ- JA PAKASTEHUONEET
SEKTIONBYGGDA KYL- OCH FRYSRUM
PREFABRICATED COLD AND FREEZER ROOMS
KÜHL- UND TIEFKÜHLZELLEN
PREFABRIKERTE KJØLE- OG FRYSEROM
PRÆFABRIKEREDE KØLE- OG FRYSERUM
KOEL- EN DIEPVRIESCELLEN
CELLULES DE RÉFRIGÉRATION ET DE CONGÉLATION
PREFABRYKOWANE KOMORY CHŁODNICZE I MROŹNIE
ASENNUS- JA KÄYTTÖOHJEET
INSTALLATIONS- OCH BRUKSANVISNING
INSTALLATION AND OPERATION MANUAL
MONTAGE- UND BEDIENUNGSANLEITUNG
INSTALLASJONS- OG BRUKSANVISNING
INSTALLATIONS- OG BETJENINGSVEJLEDNING
INSTALLATIE- EN GEBRUIKSHANDLEIDING
INSTRUCTIONS D’EMPLOI ET MONTAGE
INSTRUKCJA MONTAZU I OBS
Ł
UGI
2011 07 B

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Porkka F 840 and is the answer not in the manual?

Summary

Site Preparation and Ventilation

Ventilation and Site Requirements

Ensure adequate ventilation, heat removal, and levelness (±3 mm/m) for the installation area.

Floor Preparation for Standard Rooms

Seal standard floors with mastic to prevent moisture/vermin.

Floorless Room (SRC-Room) Setup

Ensure 90° corners, use plinths, and check dimensions for floorless rooms.

Assembly Procedure

General Assembly and Panel Locking

Use correct tools, protective gear, and understand panel lock operation.

Wall, Door, and Roof Panel Installation

Align panels, secure doors, and install roof panels correctly.

Specific Installation Features

Installation of door frame heater plugs, floor heating, and internal lighting.

Control Panel and Door Hinging

Mounting the control panel and adjusting door hinges.

Shelving and Electricals

Shelf Installation Procedure

Installing shelf supports, pipes, and plates for optimal storage arrangement.

Electrical Connection Requirements

Connecting the unit to the mains supply, verifying voltage, and ensuring separate power.

Operation and Controls

Basic Operation and Temperature Settings

Setting operational temperatures and understanding basic unit functions.

Electronic Control Panel Functions

Using the digital display, keyboard lock, indicator lights, and key functions.

Temperature Monitoring and Defrost

Checking min/max temps, stand-by mode, and defrost procedures.

Advanced Functions and Alarms

Utilizing the drying function, monitoring temperature sensors, and understanding alarms.

Maintenance and Troubleshooting

Routine Maintenance and Cleaning

Guidelines for cleaning, avoiding chemical damage, and performing periodic overhauls.

Operational Fault Diagnosis

Troubleshooting common issues like temperature faults, ice buildup, and overload.

Specific Alarm Code Explanations

Explanations for condenser temp, probe failures, and data/memory alarms.

End of Life Procedures

Unit Disposal and WEEE Compliance

Proper disposal procedures for the unit, adhering to WEEE waste regulations.

Summary

Site Preparation and Ventilation

Ventilation and Site Requirements

Ensure adequate ventilation, heat removal, and levelness (±3 mm/m) for the installation area.

Floor Preparation for Standard Rooms

Seal standard floors with mastic to prevent moisture/vermin.

Floorless Room (SRC-Room) Setup

Ensure 90° corners, use plinths, and check dimensions for floorless rooms.

Assembly Procedure

General Assembly and Panel Locking

Use correct tools, protective gear, and understand panel lock operation.

Wall, Door, and Roof Panel Installation

Align panels, secure doors, and install roof panels correctly.

Specific Installation Features

Installation of door frame heater plugs, floor heating, and internal lighting.

Control Panel and Door Hinging

Mounting the control panel and adjusting door hinges.

Shelving and Electricals

Shelf Installation Procedure

Installing shelf supports, pipes, and plates for optimal storage arrangement.

Electrical Connection Requirements

Connecting the unit to the mains supply, verifying voltage, and ensuring separate power.

Operation and Controls

Basic Operation and Temperature Settings

Setting operational temperatures and understanding basic unit functions.

Electronic Control Panel Functions

Using the digital display, keyboard lock, indicator lights, and key functions.

Temperature Monitoring and Defrost

Checking min/max temps, stand-by mode, and defrost procedures.

Advanced Functions and Alarms

Utilizing the drying function, monitoring temperature sensors, and understanding alarms.

Maintenance and Troubleshooting

Routine Maintenance and Cleaning

Guidelines for cleaning, avoiding chemical damage, and performing periodic overhauls.

Operational Fault Diagnosis

Troubleshooting common issues like temperature faults, ice buildup, and overload.

Specific Alarm Code Explanations

Explanations for condenser temp, probe failures, and data/memory alarms.

End of Life Procedures

Unit Disposal and WEEE Compliance

Proper disposal procedures for the unit, adhering to WEEE waste regulations.

Porkka F 840 Specifications

General IconGeneral
BrandPorkka
ModelF 840
CategoryRefrigerator
LanguageEnglish

Related product manuals