EasyManua.ls Logo

Portacool cyclone 3000 - Quick Setup Guide; Step 5: Initial Pad Wetting and Operation

Portacool cyclone 3000
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
QUICK SET UP
Remove box and palette Position product on level surface Plug into appropriate outlet
Fill sump or attach water hose
Fill the tank, then turn on the pump switch and the fan.
For setup, pads should appear wet before starting the
fan. Check the water gauge to monitor water level in
tank.The water ow valve on each unit is set at max
ow. However, ensure the knob is turned completely
to the left before use. Turn to the left to increase water
ow. Less water is required for cooling in more humid
environments.
Models: PAC2KCYC01, PAC2KCYC01A,
PACCYC02, PACCYC02A, PACCYC03,
PACCYC03A, PACCYC04, PACCYC04A
Models: PACCYC06
1 2 3 4
5

Related product manuals