EasyManua.ls Logo

Portalp SW10 - Pull Configuration Mounting

Portalp SW10
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION GUIDE
MOUNT THE OPERATOR(S)
RH PUSH
LH PUSH
OPERATOR OPERATOR
PULL = ROUND MOTOR IS TOWARDS THE HINGE
§ Mount the header to the doorframe with the screws provided.
§ The header will overlap the doorframe by 1-1/2" at each side.
WWW.PORTALP.COM | 17
Automatic Doors & Building Access Control
SW10 (Full Power) & SW19 (Low Energy)

Related product manuals