EasyManua.ls Logo

Potterton Promax SL range User Manual

Potterton Promax SL range
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
© Baxi Heating UK Ltd 2014
Installation & Service Instructions
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
Promax SL
Range
Condensing
Central Heating
Boiler
You can rely on
Question and Answer IconNeed help?

Do you have a question about the Potterton Promax SL range and is the answer not in the manual?

Potterton Promax SL range Specifications

General IconGeneral
BrandPotterton
ModelPromax SL range
CategoryBoiler
LanguageEnglish

Summary

Building Regulations and the Benchmark Commissioning Checklist

Installation, Commissioning, Service & Repair Requirements

4.0 Technical Data

7.0 Site Requirements

7.0 Site Requirements (Continued)

7.6 Condensate Drain Installation

Provides comprehensive guidance on condensate pipe termination and installation.

7.6 Condensate Drain Installation (Continued)

Details condensate discharge options including pumped systems and trace heating.

7.7 Flue Installation Requirements

Specifies flue terminal positioning, clearances, and plume considerations.

9.0 Plume Displacement

9.0 Plume Displacement (Continued)

10.0 Installation

10.1 Initial Preparation for Installation

Covers initial checks, template positioning, and marking for wall plate fixing.

10.0 Installation (Continued)

10.2 Preparing the Boiler Unit

Details steps for removing packaging and preparing the boiler for fitting.

10.3 Fitting the Boiler to the Wall Plate

Instructions for attaching the boiler to the wall plate using brackets.

10.6 Making the Gas Connection

Instructions for connecting the gas supply to the boiler's gas tap.

10.7 Fitting the Flue (Continued)

Continues flue fitting instructions, including securing and trim fitting.

10.8 Making Electrical Connections

Details how to connect the incoming electrical supply to the boiler.

10.4 Making Water Connections

Guides on connecting flow and return pipes to the boiler.

10.7 Fitting the Flue

Step-by-step guide for fitting the horizontal flue assembly.

10.5 Condensate Drain Connection

Details on connecting the condensate drain pipe and priming the trap.

11.0 Electrical

11.0 Electrical (Continued)

12.0 Commissioning the Boiler

12.1 Boiler Commissioning Procedure

Outlines the steps required for commissioning the boiler, including system checks.

12.0 Commissioning the Boiler (Continued)

12.2 Checking Combustion Performance

Mandatory procedure for checking CO/CO2 ratio at maximum and low rates.

12.3 Gas Inlet Pressure Check

Details how to check the operational gas inlet pressure.

13.0 Fitting the Outer Case

14.0 Servicing the Boiler

14.1 Annual Servicing Guidelines

Recommends annual servicing and outlines checks required.

14.0 Servicing the Boiler (Continued)

15.0 Changing Components

15.0 Changing Components (Continued)

17.0 Fault Finding

Electrical Supply Faults

Troubleshooting steps for electrical supply issues and reversed connections.

Live & Neutral Reversed Faults

Diagnosing faults related to reversed live and neutral connections.

Dry-Fire Fault Diagnosis

Steps to diagnose and resolve dry-fire conditions, including pump and flow switch issues.

Ignition Lockout Fault Diagnosis

Troubleshooting for ignition lockouts, checking gas supply and spark issues.

Overheat Lockout Fault Diagnosis

Diagnosing overheat lockouts, checking thermostats and seals.

Fan Lockout Fault Diagnosis

Steps to identify and resolve fan lockout issues.

Thermistor Fault Diagnosis

Troubleshooting steps for issues related to the thermistor.

Related product manuals