EasyManua.ls Logo

PowMr POW-HVM5.5M User Manual

PowMr POW-HVM5.5M
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1

Questions and Answers:

PowMr POW-HVM5.5M Specifications

General IconGeneral
ModelPOW-HVM5.5M
Rated Power5500W
Output Power5500W
Max. PV Array Power6000W
Max. DC Voltage500VDC
Starting Voltage150VDC
Output Frequency50Hz/60Hz
Frequency50Hz/60Hz
Max. Charging Current100A
Max. AC Charging Current60A
Battery Voltage48VDC
Humidity5% to 95% Relative Humidity (Non-condensing)
MPPT Voltage Range120VDC ~ 450VDC
MPPT Range120-450V
AC Voltage230VAC
CommunicationRS485/USB
CoolingFan
ProtectionOverload Protection, Short Circuit Protection, Over Temperature Protection
Operating Temperature-10°C to 50°C

Summary

Important Safety Instructions

Purpose

Outlines the manual's scope and content for users.

Scope

Defines the manual's coverage including safety, installation, and operation.

Safety Instructions

Provides crucial warnings and guidelines for safe operation and installation.

Introduction

Features

Highlights the key functionalities and capabilities of the inverter.

Basic System Architecture

Illustrates the typical system configuration with power sources and loads.

Product Overview

Identifies and describes the physical components and ports of the inverter.

Installation

Unpacking and Inspection

Details steps for checking package contents and unit condition before installation.

Select the Mount Location

Provides guidelines for choosing an appropriate and safe installation site.

Mount the Inverter

Describes the procedure for physically attaching the inverter to its mounting surface.

Preparation

Outlines necessary steps to take before commencing electrical wiring connections.

Connection

Battery Connection

Explains the process and requirements for connecting the battery bank to the inverter.

AC Input/Output Connection

Details the process for connecting AC power sources and loads to the inverter.

CT Connection

Describes the installation and function of the Current Transformer for power monitoring.

PV Connection

Describes how to connect solar PV modules to the inverter for charging.

Final Assembly

Covers the final steps after all wiring is completed, including securing covers.

Operation

Power ON/OFF

Explains the procedure for turning the inverter unit on and off.

Operation and Display Panel

Describes the front panel controls, indicators, and LCD display.

LED Indicator

Explains the meaning and status of the various LED indicators on the unit.

Function Keys

Details the purpose and usage of each function key on the control panel.

LCD Display Icons

Illustrates and explains the meaning of different icons shown on the inverter's LCD.

Mode Operation Information

Describes the inverter's operational modes based on power source availability.

LCD Setting

Setting F0 Programs

Configuration of general inverter parameters and settings.

Setting F1 Programs

Configuration of AC output parameters and priorities.

Setting F2 Programs

Configuration of battery charging parameters and types.

Setting F3 Programs

Configuration of date and time settings for the inverter.

Setting F4 Programs

Configuration of system reset and data logging parameters.

LCD display description

Operating Mode Description

Fault Reference Code

Warning Indicator

Battery Equalization

Setting For Lithium Battery

Lithium Battery Connection

Details the physical connection of lithium batteries to the inverter.

Setting for PYLON US2000 lithium battery

Specific configuration steps for PYLONTECH US2000 battery models.

Setting for lithium battery without communication

Configuration guide for lithium batteries lacking BMS communication.

Specifications

Table 1 Line Mode Specifications

Lists detailed performance specifications when operating in Line Mode.

Table 2 Inverter Mode Specifications

Lists detailed performance specifications when operating in Inverter Mode.

Table 3 Charge Mode Specifications

Details specifications related to charging modes and solar input.

Table 4 General Specifications

Covers general specifications like temperature, humidity, and dimensions.

Trouble Shooting

Parallel Installation Guide

Instruction

Outlines the capabilities and modes of parallel operation.

Package Contents

Lists the items included in the parallel connection kit.

Mounting the Unit

Guides on proper installation and spacing for multiple units.

Wiring Connection

Details the necessary wiring procedures for parallel systems.

Parallel Operation in Single phase

Explains the setup and configuration for single-phase parallel operation.

Support 3-phase equipment

PV Connection

Commissioning

Details the steps for verifying and activating parallel PV systems.

Trouble shooting

Related product manuals