ASSEMBLY IN THE REVERSE ORDER
The technological cess vides for 100% inbound quality control for all components, as well
as double 100% inbound control after their manufacture and 24-hour run in the maximum
performance mode.
Transportation and storage of the ducts in individual packing boxes is ensured in a horizontal
position.
Keep the recuperator in the factory packaging under the cover or (in enclosed space) with
relative humidity of air of no more than 70% and air temperature from -20˚С to + 40˚С.
TRANSPORTATION AND STORAGE RULES
11. The drain in the heat exchanger and
the body must coincide and be below
during the installation.
12. The fl ange must be installed correctly;
the larger trusion of the should be below.
10. Clean the heat exchanger in adry or, if
necessary, in a wet manner.
WARNING!
Before rinsing or wet cleaning of the
heat exchanger, make sure that all
the electrical components and parts
are removed from the heat exchanger
(except for the components of
“Mini heating up” and «heating the
condensate drainage».
9. Remove the blades from the fan housings
and clean them in a dry manner.
11. The drain in the heat exchanger and
>
9. Remove the blades from the fan housings
and clean them in a dry manner.
8. Unscrew the self-tapping screws.
Remove the fans on both sides.