Ventilation units are intended for creating and maintaining a healthy microclimate in premises, recommended for residential and public facilities.
Explains the countercurrent heat exchanger principle, air separation, humidity control, and high-velocity airflow for moisture removal.
Details specifications like dimensions, air exchange rates, energy consumption, recovery efficiency, and acoustic pressure.
Provides additional comfort by increasing inflow air temperature by 3-5 °C, acting as an air heat curtain when motors are off.
Prevents condensate drainage icing during cold season or freezes it if icing has occurred; mandatory for minus temperatures.
Procedure for handling freezing: activate 'mini-heating up' for 60 mins with motors off, then unfreeze and turn on to required mode.
Unit mounted in a wall hole, at least 100-150 mm from ceiling/walls, with a 3-5 degree slope towards outside.
Preparation of hole for switch, grooves for electrical supply network between system, switch, and power source.
Covers wiring compliance, isolator switch, mains supply checks, fixed wiring, avoiding water spray, and disconnection means.
Details wiring diagram, remote control/mobile app for operation, cable entry, voltage suitability, and earthing.
Periodic checks: fan quality, graphic symbols, control device operation. Turn off for issues like noise, damage, or low outside temperature.
Units adapt automatically to existing electrical supply networks, reducing noise and ensuring declared characteristics.
Details steps for turning off, de-energizing, disassembling, cleaning fans and heat exchanger, and reassembly.
Ducts packed horizontally. Keep in factory packaging under cover or enclosed space, humidity <70%, temp -20°C to +40°C.
Lists included items: ventilation unit, documentation, remote control, and packing box.
All electrical work by qualified specialist. Ensure compliance with installation rules and norms. Disconnect from supply before work.
Do not operate if foreign objects may jam impellers. Do not operate in premises with aggressive substances or incorrect temperature.
Post-commissioning compliance with LVD, Machinery Safety, EMC, RoHS, and Ecodesign (ErP) directives.