EasyManua.ls Logo

Procom FBD32RT - Installing Hood

Procom FBD32RT
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.usaprocom.com
13
200069-01A
INSTALLATION
3. Attach gas line to replace gas regulator.
See Connecting to Gas Supply, page 14.
4. Check all gas connections for leaks. See
Checking Gas Connections, page 16.
IMPORTANT: When nishing your rebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the rebox. Combustible materials
should never overlap the rebox front.
Figure 10 - Rough Opening for Corner
Installation
CAUTION: Do not operate
replace without hood in place.
1. Align 3 holes in upper side of hood with
holes in heat insulation board (see Fig-
ure 11).
2. Insert screwdriver through hole in top re-
box panel to secure hood to heat insulation
board with 3 screws (see Figure 11).
INSTALLING HOOD
35"
28
1
/
8
"
39
3
/
4
"
56
1
/
4
"
Figure 11 - Hood Installation
Hood
Heat
Insulation
Board
Top of Firebox
Top
Firebox
Panel

Related product manuals