EasyManua.ls Logo

Project Source F201E514CP - Page 6

Project Source F201E514CP
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
ASSEMBLY INSTRUCTIONS
4. Attach vertical shower pipe to the top of the middle
elbow of valve body (D).
4
1
4
2
4-1
all
5. Attach vertical tub pipe to the bottom of the middle
elbow of valve body (D).
Note: Recommend 8 in. minimum distance to spout.
For shower only installation attach plug (H) to the
bottom of the middle elbow of valve body (D) using
thread seal tape.
6. Install stub-out pipe (not included) for spout (G).
Use proper length stub-out pipe so pipe threads will
extend 3-3/4 to 4 inches beyond finished wall.
1
5
1
6
5
6
3
2
5-1
5-2
2
6-1
all
all
D
3-3/4 to 4 in.
H

Related product manuals