EasyManua.ls Logo

Prolyte MPT Tower - Assembly Instructions; Assembly of a lifting-system with 4 towers (Ground support)

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROLYTE PRODUCTS GROUP © 2001
Prolyte has made every effort to ensure the accuracy of this manual, no liability will be accepted for errors. Prolyte reserves the right to change or alter
their products or manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
PROLYTE PRODUCTS GROUP - phone +31 (0)594 85 15 15 - fax +31 (0)594 85 15 16 - www.prolyte.com
pages 4 of 12
Performance in aluminium
Manual-MPT Tower
7) Measure the area where the tower needs to be and make sure there is enough room for all
components including the outriggers with the plywood padding (the free and cleared building site for
each tower, needs to be app. 3m wide, 13m deep and 14m high).(
2
)
7. ASSEMBLY INSTRUCTIONS
Assembly of a lifting-system with 4 towers (Ground support)
2
Except in the situations of hazardous objects or obstacles as mentioned above.
1. Mast section (H30V truss)
2. Base section
3. Long outrigger
4. Top section
5. Hinges
6. Hand winch/Hoist
7. Sleeve block