6.0 Maintenance
It is a requirement of BS 5839-9:2011 that a maintenance agreement be in place for the EVCS. The
maintenance schedule should be as follows:
Frequency
Test
Weekly
Test a different outstation on the system each week and make a call to the control.
Repeat each week until all outstations and master stations are tested. Record these
results in the site log. *if more than one master station is present alternate weekly.
Biannually
Engineer call to check system operation, intelligibility, field strength of attached AFILS
equipment and check battery health. Record results and any variations into the site
Log Book
Yearly
Engineer call to check system operation perform 100% outstation and master station
operation, field strength of attached AFILS equipment and check battery health.
Record results and any variations into the site Log Book
5 Yearly
In addition to Yearly tests replace all batteries and record in Log Book.