Note:
1) After the battery module is powered on,
the soft-start function takes 3 sec to
activate. Battery is ready to have a high-
power output after soft-start operation is
finished.
2) During capacity expansion or
replacement, when paralleling different
SOC/voltage of modules together, please
maintain the system in idle for ≥15mins or
till the SOC LEDs becomes similar(≤1dot
difference) before normal operation.
Figure 18: Group batteries power on process