EasyManuals Logo

Quooker PRO3 User Manual

Quooker PRO3
2 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #2 background imageLoading...
Page #2 background image
1
3
2
1. Connect inlet valve
Close the main shut-o valve. Fit the
supplied isolation valve. Connect the inlet
valve to the isolation valve with the bre
washer.
2. Connect cold water hose
Connect the cold water hose with the
hose screen to the inlet valve.
3. Connect hot water hose
Connect the hot water hose with the hose
screen to the mains.
Connecting water
The Quooker operates under mains water pressure and must always be tted to the water pipe
with the supplied inlet valve.
The Nordic single tap, the Fusion tap or the Flex tap must be installed according to the locally
applicable regulations.
C
If necessary
If only a G½" connection is present,
use one of the G½" couplings with
the supplied bre washers.
Cold
Hot
Hot

Other manuals for Quooker PRO3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quooker PRO3 and is the answer not in the manual?

Quooker PRO3 Specifications

General IconGeneral
Tank Capacity3 liters
Heating Time10 minutes
Required Hole Diameter35 mm
Energy Efficiency ClassA
Boiling Water Temperature100°C
InstallationUnder-sink
MaterialStainless Steel
Warranty2 years
Power1600 W
Voltage230 V
Safety FeaturesChildproof tap

Related product manuals