1
3
2
1. Connect inlet valve
Close the main shut-o valve. Fit the
supplied isolation valve. Connect the inlet
valve to the isolation valve with the bre
washer.
2. Connect cold water hose
Connect the cold water hose with the
hose screen to the inlet valve.
3. Connect hot water hose
Connect the hot water hose with the hose
screen to the mains.
Connecting water
• The Quooker operates under mains water pressure and must always be tted to the water pipe
with the supplied inlet valve.
• The Nordic single tap, the Fusion tap or the Flex tap must be installed according to the locally
applicable regulations.
C
If necessary
If only a G½" connection is present,
use one of the G½" couplings with
the supplied bre washers.
Cold
Hot