Installation of the Scale Control R with a PRO3 B
– Follow the steps below to install the Scale Control R with a Quooker PRO3 B tank.
– The ‘Q’ on the hood of the tank is the on / off switch.
B
1
3
21
1. Connecting the inlet hose
Connect the reducing coupler from the
Scale Control R to the inlet reducing
valve with the blue bre washer. Connect
the Scale Control R inlet hose (long) to
the reducing coupler.
2. Connecting the outlet hose
Connect the Scale Control R outlet hose
(short) to the tank inlet hose with the blue
bre washer.
3. Flushing out the cartridge
Open the isolation valve. Ventilate the
system by activating the boiling water
tap (push-push-turn) and run for 20
seconds. Check for leaks. Now activate
the boiling function again and let the
water run for about 5 minutes, until the
water runs clear. Switch on the tank using
the Q button. Once the water has heated
up again, the Quooker system is ready to
use (continue to section C).
B
A