EasyManuals Logo

Radcal Accu-Gold Touch User Manual

Radcal Accu-Gold Touch
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
GETTING STARTED
This describes assembly and operation of the Accu-Dose
System on page 5 comprising a control unit, a diagnostic kV
sensor and a 6cc ion chamber with an ion-chamber digitizer.
IMPORTANT: Stabilization is required before making any
ion chamber measurements. Stabilization is best done by
putting the unit in Dose Rate mode/High Sensitivity and
waiting for 3 minutes. See page 21 for details.
Assembly
Connect the sensor cable to the control unit
:
Insert the rectangular connector on the sensor cable into the
socket on the right side of the instrument with the Radcal logo
facing you. It will click into place. To disconnect, pinch the levers
on the side of the connector and pull it from the socket.
10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Radcal Accu-Gold Touch and is the answer not in the manual?

Radcal Accu-Gold Touch Specifications

General IconGeneral
BrandRadcal
ModelAccu-Gold Touch
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals