EasyManua.ls Logo

R&S ZNLE Series - Page 52

R&S ZNLE Series
81 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Trying Out the Instrument
R&S
®
ZNLE
52Getting Started 1323.2873.02 ─ 07
6. The "Calibration" dock widget indicates the standard measurements that
make up a "Trans Norm" calibration.
Select "Through (mm)" to initiate the measurement of the connected Through
standard. Measuring the isolation between ports 1 and 2 is optional. Skip it for
now.
The analyzer performs a calibration sweep for the measured quantity S
21
. The
magnitude and phase of the result is displayed in two diagrams, together with
the expected typical result for a Through standard. The similarity of real and
expected traces indicates that the Through standard has been properly con-
nected. After the R&S ZNLE has completed the calibration sweep and calcula-
ted the correction data, the "Apply" button is enabled.
7. Select "Apply" to close the wizard and apply the system error correction to the
current channel.
A "Cal" label appears in the trace list.
To proceed with the measurement, remove the Through standard and connect the
DUT again.
Performing Measurements

Other manuals for R&S ZNLE Series

Related product manuals