EasyManua.ls Logo

Ranger R76LT - Installation Checklist

Ranger R76LT
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R76 Series of Tire Changers 11 P/N 5900346 Rev. C — Dec. 2019
Installation Checklist
Following are the steps needed to install the Tire Changer. Perform them in the order shown.
1. Review the installation Safety Rules.
2. Make sure you have the necessary Tools.
3. Find an appropriate Location.
4. Make sure there is adequate Clearance around and above.
5. Unpack the Tire Changer.
6. Anchor the Tire Changer.
7. Connect to Power.
Requires a licensed Electrician
.
8. Connect to Air.
9. Prepare the Lube Bucket.
10. Grease the Assist Tower Post (R76ATR only).
11. Test the Tire Changer.
12. Review the Final Checklist.

Related product manuals