RAPPORTO DI INSTALLAZIONE
INSTALLATION REPORT - INSTALLATIONSBERICHT
DA COMPILARE A CURA DELL’INSTALLATORE
TO BE COMPLETED BY THE FITTER - DURCH DEN MONTEUR AUSZUFÜLLEN
Sollevatore modello matr.
Lift model serial number
Hebebühne Modell Serie-Nr.
Operazione di controllo
Control operation - Kontrolloperation
• Verifi ca della tensione di alimentazione _______________________________________________________________F
Power voltage check
Kontrolle Stand Tragmutterverschleiss
• Interruttore generale ___________________________________________________________________________________ F
Main switch
Hauptschalter
• Comando salita e discesa ______________________________________________________________________________F
Up/down control
Steuerung Heben und Senken
• Corretto senso di rotazione del motore ________________________________________________________________F
Correct direction of motor rotation
Richtige Drehrichtung des Motors
• Controllo funzionamento valvola taratura centralina e piombatura ___________________________________F
Control unit setting valve operation and seal inspection
Kontrolle Funktionstüchtigkeit Eichventil Schaltschrank und Lotung
• Controllo funzionamento elettrovalvola discesa _______________________________________________________F
Downward movement solenoid valve inspection
Kontrolle Funktionstüchtigkeit Absenkelektroventil
• Controllo coppia di serraggio delle viti di fi ssaggio Guide al telaio ____________________________________F
Tightening torque inspection of guide/frame retention screws
Kontrolle Anzugsmoment der Befestigungsschrauben Führungen am Rahmen
• Controllo corretto scorrimento dei bracci di presa (1011K e 1021M) __________________________________F
Correct clamp arm sliding inspection (1011K and 1021M)
Kontrolle einwandfreie Gleitung Aufnahmearme (1011K und 1021M)
• Controllo corretto inserimento e sgancio degli arresti __________________________________________________F
Correct arm stop engagement and release control
Kontrolle einwandfreies Ein- und Ausklinken der Armarretierungen
• Controllo livello olio centralina _________________________________________________________________________F
Control unit oil level check
Kontrolle Schaltschrank-Ölstand
• Controllo lubrifi cazione delle guide di scorrimento ____________________________________________________F
Slide guide lubrication control
Kontrolle Schmierung der Gleitführungen
• Controllo del funzionamento del cicalino antischiacciamento __________________________________________F
Check operation of the crush-protection buzzer.
Funktionskontrolle des Quetschschutzsummers
• Controllo della presenza e collocazione degli adesivi __________________________________________________F
Adhesive and adhesive position check
Kontrolle Vorhandensein und Anbringung der Kleber
• Portata - Carrying capacity - Tragfähigkeit __________________________________________________________________F
• Avvertenze - Warnings - Hinweise _________________________________________________________________________F
• Matricola - Serial number - Serie-Nr. ________________________________________________________________________ F
Firma e timbro dell’installatore
Fitterís signature and stamp - Unterschrift und Stempel des Monteurs
Data di installazione
Installation date - Datum der Installatiom