5. BEFORE INSTALLATION
Please read these instructions thoroughly and completely
before installation and before use. Failure to do so could
cause property damage or serious personal injury or death
and void your warranty.
By installing this product, you acknowledge the terms of
the manufacturer's warranty and your Authorized Dealer's
return policies. The heaters that have been installed
cannot be returned. If you have any questions regarding
the warranty or product return policies, please consult
your Author ized Dealer prior to installation.
Open the box and carefully unpack the heater. Inspect all
components.
Electrical Heater
Installation and Operation Manual
6. INSTALLATION
The heaters are designed for indoor and outdoor use.
The heater must be mounted on a vertical position
over a ground level base or a wall.
Secure the heater to the base with screws (not
provided).
CAUTION: Combustible materials should be kept at least
24" (610 mm) away from the heater.
Recommended Clearances:
TOP: 18" (457 mm)
SIDES: 6" (152 mm) away from your heater and the
outlet hot water pipe.
7. WATER CONNECTION
Please follow all plumbing instructions carefully. This
        
plumber in accordance with all applicable national, state,
pro vincial, and local plumbing codes.
IMPOR    




NOTE:




will VOID the warranty.
The heater must be installed after installation of the

Models ELS 0005 and 0011 are supplied with
1-1/2" NPT inlet and outlet plumbing connections.
Models ELS 0018 and 0027 are supplied with
2" NPT inlet and outlet plumbing connections.
All heater models are rated operation ONLY on 240V
single-phase, 60Hz power.

No Hartford loop is required.

pump to allow water to run through the spa/pool heater for
at least 5-10 minutes. This process purges all the air from
the water lines and must be performed prior to turning on
the power at the heater.
CAUTION: Failure to follow this step can cause permanent

When any maintenance is performed on the spa/pool that
may introduce air into the plumbing pipes, it is important

the lines before allowing the heater to power up.


is on. All air must be purged from the system before any
heat start-up. It is important to purge all air after cleaning

air reservoir during this procedure, the circulation system
must be on for at least two (2) minutes before you turn
power on to this heater.


by the heater and transfers the heat to the spa/pool and
      
       
 
15 gpm (57 lpm) and maximum of 60 gpm (227 lpm). A

60 gpm (227 lpm). The heater will not energize elements

(57 lpm) has been established, the heating elements will


the tank has had time to escape.
CAUTION:       
   
times.


         
        
       
         
