Safety and connection requirements for the gas supply system.
Critical warnings regarding installation, adjustment, and service of controls by qualified personnel.
Step-by-step guide for initial start-up, including gas checks and power activation.
Steps for pre-start-up checks, system inspection, and initial start-up.
Preparing the unit by checking power, gas pressure, and attaching manometers.
Performing final checks, recording data, and follow-up actions after start-up.
Introduction to troubleshooting, error codes, heater errors, and faults.
Safety and connection requirements for the gas supply system.
Critical warnings regarding installation, adjustment, and service of controls by qualified personnel.
Step-by-step guide for initial start-up, including gas checks and power activation.
Steps for pre-start-up checks, system inspection, and initial start-up.
Preparing the unit by checking power, gas pressure, and attaching manometers.
Performing final checks, recording data, and follow-up actions after start-up.
Introduction to troubleshooting, error codes, heater errors, and faults.
| Input BTU/hr | 500, 000 |
|---|---|
| Water Connection Size | 2" NPT |
| Fuel Type | Natural Gas or Propane |
| Operating Pressure | 160 psi |
| Vent Diameter | 4" |
| Gas Connection Size | 1" NPT |