EasyManuals Logo

Red Sea ReefDose 2 User Manual

Red Sea ReefDose 2
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Red Sea ReefDose
®
10
Installation
The ReefDose unit is splashproof and designed to work inside an aquarium cabinet.
It is not waterproof and therefore it is not advisable to mount it directly above open water.
The ReefDose can be mounted directly of any vertical surface
using the mounting bracket provided, which should be
securely screwed to the surface. Self-adhesive pads are not
recommended.
Alternatively, the ReefDose may also be placed directly on
any at surface such as a shelf, on either its bottom, top, back
or both sides (see gure 2) without any impediment to its
functions and operation. If placed on its bottom surface, make
sure that the dosing tubes are not restricted in any way.
Before on-boarding the ReefDose to your ReefBeat, the individual head priming buttons are active so that you
can test that the heads are working and install the supplement containers and prime them ready for calibration.
Once the ReefDose is on-boarded to the App, the priming buttons are deactivated by default to prevent accidental
supplementing. They can be activated as and when required from the ReefBeat App as described below.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Red Sea ReefDose 2 and is the answer not in the manual?

Red Sea ReefDose 2 Specifications

General IconGeneral
BrandRed Sea
ModelReefDose 2
CategoryWater Pump
LanguageEnglish

Related product manuals